Construction Status Information

Summer 2017

3RR Construction

  • Rehabilitate and redeck the inner half of the northbound U.S. 202 bridge over Amtrak and the ramp from U.S. 30 east to U.S. 202 north
  • Replace the concrete pavement for the outside exit lane from U.S. 202 south to U.S. 30
  • Repair abutments for the Morstein Road overpass

Go here for a detailed construction status report.